In Between Rains
In between all the rain showers Boxes in Fields continued to move forward with the plans for the house box. Beam materials were ordered and delivered, plans on how to lift the box in the air were finalized, and designs for the house were ran for strength and integrity against hurricane forces. First things first a chunk of beam leftover from before Harvey was dug out of the scrap pile. Not being used for any structural purposed, the Planner was…