Septic Sucker Completed
A working pump arrived over the weekend just a few days after the first was discovered broken. Not wanting to waste warm weather and the list of things to do backing up, the Planner got to work late Monday afternoon after pulling 9+ hours are work. Yes, work that thing that pays the bills.
Poor Planner he was doing back breaking labor and I was plucking the last fruits from the box garden. Christmas tomatoes, anyone?
Tuesday rain collection water lines, septic lines from both to the transfer station to the septic tank and from the transfer station to the non-existent bathroom, and water outlets for the bathroom and water outlet for the trailer were all laid out and plumed in place.
Tuesday lunch time additional rocks were placed at the transfer station and the rain collection water lines were connected at a junction box. From the transfer station on the south side another PVC line runs under the Work Box. This is the septic line for the future house in the sky.
Tuesday afternoon dirt was piled and smooth out and trailer was moved back into place. Septic sucker lines for trailer and House Boxes installed and working, water lines for rain collection system and House Boxes installed for future usage, septic and water line for bathroom awaits a toilet and sink.